Breadcrumb
- Home
- Assessments
- Bioregional Assessment Program
- Clarence-Moreton bioregion
- 2.1-2.2 Data analysis for the Clarence-Moreton bioregion
- 2.1.6 Water management for coal resource developments
Page 70 of 77
Summary
As a result of the discontinuation of the Metgasco West Casino Gas Project, there will not be a water management plan for the project in the foreseeable future. Some relevant information can be found in Metgasco’s water management plan (WMP) for the water and drilling fluids produced during exploration or pilot testing in Metgasco’s three exploration permits, Petroleum Exploration Licence (PEL) 13, 16 and 426, in NSW. However, the plan is only applicable for the produced water during the exploration phase from 2012 to 2013.
Last updated:
8 January 2018

Summary and download
Product Finalisation date
2016
PRODUCT CONTENTS
- 2.1.1 Geography
- 2.1.2 Geology
- 2.1.2.1 Methods
- 2.1.2.2 Observed data
- 2.1.2.3 Statistical analysis and interpolation
- 2.1.2.3.1 Three-dimensional geological model workflow
- 2.1.2.3.2 Definition of the stratigraphic column
- 2.1.2.3.3 Selection of input datasets
- 2.1.2.3.4 Representation of structural elements in the three-dimensional geological model
- 2.1.2.3.5 Characterisation of binding horizons of shallow aquifers (alluvium and basalt)
- 2.1.2.3.6 Characterisation of the bedrock stratigraphic units in the Clarence-Moreton bioregion
- 2.1.2.3.7 Isopach maps, depth to formation top and depth to base of formation
- 2.1.2.4 Gaps
- References
- Datasets
- 2.1.3 Hydrogeology and groundwater quality
- 2.1.4 Surface water hydrology and water quality
- 2.1.5 Surface water – groundwater interactions
- 2.1.6 Water management for coal resource developments
- Glossary
- Citation
- Acknowledgements
- Contributors to the Technical Programme
- About this technical product
ASSESSMENT
ASSESSMENT COMPONENT