References

AGE Pty Ltd (2011) Maules Creek Coal Project environmental assessment – Appendix M – groundwater impact assessment. Prepared for Aston Resources Ltd. Viewed 9 September 2015, http://www.whitehavencoal.com.au/environment/docs/appendix-m-groundwater-assessment-part-1.pdf.

Aryal SK, Northey J, Slatter E, Ivkovic K, Crosbie R, Janardhanan S, Peña-Arancibia J and Bell J (2018a) Observations analysis, statistical analysis and interpolation for the Namoi subregion. Product 2.1-2.2 for the Namoi subregion from the Northern Inland Catchments Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NIC/NAM/2.1-2.2.

Aryal SK, Peña-Arancibia J, Viney N, Yang A, Wang B, Hughes J, Merrin LE, Marvanek S, Davies P, Bell J, Zhang Y, Vaze J, Singh R and Kim S (2018b) Surface water numerical modelling for the Namoi subregion. Product 2.6.1 for the Namoi subregion from the Northern Inland Catchments Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NIC/NAM/2.6.1.

Boggabri Coal Pty Ltd (2014) Site water balance. Viewed 21 July 2015, https://idemitsu.com.au/uploads/files/bcenviro/EMPS/130212_BogSWB_Rev5.pdf.

Crosbie R, Peeters L and Carey H (2016) Groundwater modelling. Submethodology M07 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M07.

Doherty J and Welter D (2010) A short exploration of structural noise. Water Resources Research 46, W05525.

Douglas Partners (2010) Hydrogeological assessment – Appendix R Rocglen Coal Mine Extension Project environmental assessment. Prepared for Whitehaven Coal Limited. Viewed 30 August 2016, http://www.whitehavencoal.com.au/environment/docs/appendix-r-hydrogeological-assessment.pdf.

GeoTerra Pty Ltd (2008) Sunnyside Coal Project groundwater assessment. Specialist Consultant Studies Compendium, part 1. Prepared for Namoi Minint Pty Ltd. Viewed 16 December 2015, http://www.whitehavencoal.com.au/environment/docs/part-1-groundwater-assessment-a.pdf.

Herron NF, Peeters L, Crosbie R, Marvanek SP, Pagendam D, Ramage A, Rachakonda PK and Wilkins A (2018) Groundwater numerical modelling for the Hunter subregion. Product 2.6.2 for the Hunter subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/HUN/2.6.2.

HydroSimulations (2015) Narrabri Mine Modification 5 environmental assessment Appendix B – groundwater assessment. Prepared for Narrabri Coal Operations Pty Ltd. Viewed 08 March 2016, http://www.whitehavencoal.com.au/environment/docs/pa-080144-mod-5-appendix-b-groundwater-assessment.pdf.

Merrick NP and Alkhatib M (2012) Tarrawonga Coal Project – environmental assessment: Appendix A – groundwater assessment. Prepared for Tarrawonga Coal Pty Ltd. Viewed 01 August 2016, http://www.whitehavencoal.com.au/environment/docs/01185252-appendix-a-groundwater-assessment-part-1.pdf.

Merrick NP and Alkhatib M (2013) Vickery Coal Project environmental impact statement – Appendix A: groundwater assessment. Prepared for Whitehaven Coal Limited. Viewed 16 December 2015, http://www.whitehavencoal.com.au/environment/docs/appendix-a-groundwater-assessment-part-1.pdf.

Nicol C, Liu T and Merrick NP (2014) Caroona Coal Project: gateway application – Appendix C: preliminary groundwater assessment. Prepared for BHP Billiton.

Peeters L, Pagendam D, Gao L, Hosack G, Jiang W and Henderson BL (2016) Propagating uncertainty through models. Submethodology M09 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M09.

Plischke E, Borgonovo E and Smith CL (2013) Global sensitivity measures from given data. European Journal of Operational Research 226, 536–550.

Santner TJ, Williams BJ and Notz WI (2003) The design and analysis of computer experiments. Springer, New York.

Santos (2012) Surface water management. Presentation to Santos Community Committee – Narrabri. Viewed 7 September 2016, https://narrabrigasproject.com.au/uploads/2015/10/SantosCCC_Narrabri_minutes_9Oct2012_presentation.pdf.

White JT, Doherty JE and Hughes JD (2014) Quantifying the predictive consequences of model error with linear subspace analysis. Water Resources Research 50, 1152–1173. Viewed 20 September 2016, http://dx.doi.org/10.1002/2013WR014767.

WRM Water and Environment (2013) Watermark Coal Project environmental impact statement – Appendix S surface water impact assessment. Prepared for Shenhua Watermark Coal Pty Limited. Viewed on 8 September 2015, https://majorprojects.affinitylive.com/public/f37282787960f34d67369c3c8633cd03/20.%20Watermark%20Coal%20Project%20EIS%20-%20Appendix%20S%20-%20Surface%20Water%20Impact%20Assessment.pdf.

Last updated:
6 December 2018
Thumbnail of the Namoi subregion

Product Finalisation date

2018
PRODUCT CONTENTS

ASSESSMENT