References

AGE (2010) Continuation of Boggabri Coal Mine groundwater assessment. Australasian Groundwater & Environmental Consultants Pty Ltd, October 2010.

AGE (2011) Maules Creek Coal Project groundwater impact assessment. Australasian Groundwater & Environmental Consultants Pty Ltd, June 2011.

AGE (2013) Watermark Coal Project groundwater assessment. Australasian Groundwater & Environmental Consultants Pty Ltd, January 2013.

Aryal SK, Northey J, Slatter E, Ivkovic K, Crosbie R, Janardhanan S, Peña-Arancibia J and Bell J (2018) Observations analysis, statistical analysis and interpolation for the Namoi subregion. Product 2.1-2.2 for the Namoi subregion from the Northern Inland Catchments Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NIC/NAM/2.1-2.2.

CDM Smith (2014) Santos Narrabri Gas Project groundwater modelling report. CDM Smith Australia Pty Ltd, September 2014.

Crosbie R, Peeters L and Carey H (2016) Groundwater modelling. Submethodology M07 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M07.

Douglas Partners (2010) Hydrogeological assessment for Rocglen Coal Mine Extension Project. Douglas Partners, December 2010.

Harbaugh AW, Banta ER, Hill MC and McDonald MG (2000) MODFLOW-2000, the U.S. Geological Survey modular ground-water model – user guide to modularization concepts and the ground-water flow process. US Geological Survey Open-File Report. Viewed 21 April 2017, https://pubs.usgs.gov/of/2000/0092/report.pdf.

Heritage Computing (2012) A hydrogeological assessment in support of the Tarrawonga Coal Project environmental assessment. Heritage Computing Pty Ltd, January 2012.

Heritage Computing (2013) Vickery Coal Project groundwater assessment. Heritage Computing Pty Ltd, January 2013.

Hydro Simulations (2014) Caroona Coal Project: gateway application preliminary groundwater assessment. Heritage Computing Pty Ltd, March 2014.

Hydro Simulations (2015) Narrabri mine modification groundwater assessment. Heritage Computing Pty Ltd, August 2015.

McNeilage C (2006) Upper Namoi groundwater flow model, model development & calibration. NSW Government – Department of Natural Resources, Parramatta.

Merrick N (2001) Report on Lower Namoi groundwater flow model: calibration 1980–1998. Project Number C99/44/001. Insearch Limited report for Department of Land & Water Conservation, Sydney.

Panday S and Huyakorn PS (2008) MODFLOW SURFACT: a state-of-the-art use of vadose zone flow and transport equations and numerical techniques for environmental evaluations. Vadose Zone Journal 7(2), 610. DOI: 10.2136/vzj2007.0052. Viewed 21 April 2017, https://dl.sciencesocieties.org/publications/vzj/abstracts/7/2/610.

RCA (2010) Groundwater impact assessment for Werris Creek Coal Mine Project. Robert Carr & Associates Pty Ltd, December 2010.

Santos (2013) Groundwater impact assessment. Narrabri Gas Project. Halcrow for Santos Limited.

SWS (2012) Namoi Catchment water study. Phase 3 report. Schlumberger Water Services. Viewed 25 November 2016, http://archive.lls.nsw.gov.au/__data/assets/pdf_file/0020/526430/archive_NCWS_Phase-3-report.pdf.

Welsh WD (2006) Great Artesian Basin transient groundwater model. Bureau of Rural Sciences, Canberra. Viewed 21 April 2017, http://www.southwestnrm.org.au/sites/default/files/uploads/ihub/welsh-wd-2006-great-artesian-basin-transient-groundwater-model.pdf.

Last updated:
6 December 2018
Thumbnail of the Namoi subregion

Product Finalisation date

2018
PRODUCT CONTENTS

ASSESSMENT