Page 52 of 54
This technical product was reviewed by several groups:
- Senior Science Leaders: David Post (Projects Director), Steven Lewis (Science Director, Geoscience Australia), Brent Henderson (Science Director, CSIRO) and Becky Schmidt (Products Manager)
- Technical Assurance Reference Group: Chaired by Peter Baker (Principal Science Advisor, Department of the Environment and Energy), this group comprises officials from the NSW, Queensland, South Australian and Victorian governments
- Independent reviewers: Dirk Mallants (CSIRO) and Peter Cook (NCGRT).
Thanks to Metgasco Limited for sharing its forecast water production data and preliminary groundwater modelling report.
Last updated:
23 October 2018
Summary and download
Product Finalisation date
2016
PRODUCT CONTENTS
- 2.6.2.1 Methods
- 2.6.2.2 Review of existing models
- 2.6.2.3 Model development
- 2.6.2.4 Boundary and initial conditions
- 2.6.2.5 Implementation of the coal resource development pathway
- 2.6.2.6 Parameterisation
- 2.6.2.7 Observations and predictions
- 2.6.2.8 Uncertainty analysis
- 2.6.2.9 Limitations and conclusions
- Citation
- Acknowledgements
- Contributors to the Technical Programme
- About this technical product
ASSESSMENT
ASSESSMENT COMPONENT