Appendix B Activities for the Gloucester subregion

B.1 Life-cycle stages and activities for coal seam gas operations

Table 18 Unique activities (for coal seam gas operations) during exploration and appraisal life-cycle stage for the Gloucester subregion

Activity

Abandonment

Construction of access roads and easements (e.g. for drilling rigs and equipment)

Drill cutting disposal

Drill stem testing (extraction)

Drilling and coring

Fuel and oil

Ground-based geophysics

Materials delivery and storage

Power and communications

Pump testing

Site clean-up and rehabilitation

Site preparation

Slug testing (injection)

Surface core testing

Surface water and mud storage and evaporation

Temporary Accommodation, administration, workshop, depots, service facilities

Table 19 Unique activities (for coal seam gas operations) during construction life-cycle stage for the Gloucester subregion

Activity

Accommodation, administration, workshop, depots, service facilities

Brine storage ponds, pumps and water disposal pipelines

Cementing and casing

Construction of access roads and easements (e.g. for drilling rigs and equipment)

Drill cutting disposal

Drill stem testing (extraction)

Drilling and logging

Fuel and oil

Fuel and oil storage facilities

Gas-gathering pipeline networks

Gas and water-gathering pipeline networks (well to processing plant)

Gas compression stations

Gas processing plant

Groundwater monitoring bore construction

Groundwater supply bore

Hydraulic fracturing

Hydraulic fracturing concentrate delivery

Hydraulic fracturing fluid injection and disposal

Hypersaline brine ponds

Materials delivery and storage

Perforation

Power and communications

Power generation facility (for processing plant)

Remediation

Sewage treatment and disposal

Site preparation

Surface water and mud storage and evaporation

Treated water pond

Trunk gas pipelines and associated easements (processing plant to town)

Water treatment plant (RO, fixed resin, fixed disc, electrochemical, etc)

Table 20 Unique activities (for coal seam gas operations) during production life-cycle stage for the Gloucester subregion

Activity

Accommodation, administration, workshop, depots, service facilities

Brine storage ponds, pumps and water disposal pipelines

Fuel and oil

Fuel and oil storage facilities

Gas-gathering pipeline networks

Gas and water-gathering pipeline networks (well to processing plant)

Gas compression stations

Gas processing plant

Groundwater monitoring bore construction or expansion

Groundwater supply bore

Hypersaline brine ponds

Materials delivery and storage

Operation access roads and easements (e.g. for drilling rigs and equipment)

Power and communications

Power generation facility (for processing plant)

Sewage treatment and disposal

Staff movement and activities

Treated co-produced water disposal

Treated water pond

Trunk gas pipelines and associated easements (processing plant to town)

Untreated co-produced water storage, processing and disposal (pilot stage only)

Water and gas extraction

Water treatment plant (RO, fixed resin, fixed disc, electrochemical, etc)

Table 21 Unique activities (for coal seam gas operations) during decommissioning life-cycle stage for the Gloucester subregion

Activity

Fuel and oil

Materials delivery and storage

Pressure concrete completion

Pressure concrete durability

Process production plant

Sewage treatment and disposal

Table 22 Unique activities (for coal seam gas operations) during work-over life-cycle stage for the Gloucester subregion

Activity

Materials delivery and storage

Site preparation

Waste disposal

Water sourcing (for injection)

B.2 Life-cycle stages and activities for open-cut coal mines

Table 23 Unique activities (for open-cut coal mines) during exploration and appraisal life-cycle stage for the Gloucester subregion

Activity

Abandonment

Drill cutting disposal

Drilling and coring

Ground-based geophysics

Materials delivery and storage

Site clean-up and rehabilitation

Site preparation and construction for drilling activities

Slug testing (injection)

Surface core testing

Surface water and mud storage and evaporation

Temporary accommodation, administration, workshop, depots, stock piles, service facilities

Table 24 Unique activities (for open-cut coal mines) during development life-cycle stage for the Gloucester subregion

Activity

Administration, workshop, service facilities (construction phase)

Creek diversions, levee bunds, creek crossings

Creek line diversion

Dam construction

Dam construction for freshwater storage

Dam construction for mine water storage

Dam construction for tailings storage

Groundwater monitoring bore construction

Groundwater supply bore

Haul road construction

Mine dewatering, treatment, reuse and disposal

Off-lease and on-lease roadways (construction phase)

Power, water and communications network: connection to existing grids

Rail easement construction

Rainwater and runoff diversion

Temporary diesel generators (construction phase)

Topsoil and waste rock dump site preparation

Waste byproduct: treatment of water

Waste rock blasting, excavation and storage

Table 25 Unique activities (for open-cut coal mines) during production life-cycle stage for the Gloucester subregion

Activity

Coal excavation

Coal on-site processing

Coal on-site transport

Coal on-site transport: stockpiles

Coal processing waste material: handling, transport, storage

Daily operational use of roads: haulage, inspection, maintenance, etc.

Groundwater monitoring bore construction or expansion

Haul road construction

Materials storage facilities (e.g. fuel, oil and explosives)

Mine dewatering, treatment, reuse and disposal

New haul road construction

Off-lease and on-lease roadways

Onsite mine equipment storage

Pit backfill (in-pit dump)

Pit wall (stabilisation) dewatering, treatment, reuse and disposal

Product coal stockpiling

Run-of-mine (ROM) plants

Tailings decant water dam

Topsoil excavation and storage

Waste rock blasting, excavation and storage

Table 26 Unique activities (for open-cut coal mines) during closure life-cycle stage for the Gloucester subregion

Activity

Dismantling and removal of built infrastructure

Pit backfill

Post-closure mine site decontamination

Post-closure water filling the pit

Water management structures (dams, levee bunds and diversions)

Table 27 Unique activities (for open-cut coal mines) during rehabilitation life-cycle stage for the Gloucester subregion

Activity

Groundwater monitoring bore: mine closure

Recontoured landforms (slopes, gradients, etc.)

Recontoured landforms (slopes, gradients, etc.): from building, rail and road infrastructure

Revegetation