Crosbie R, Peeters L and Carey H (2016) Groundwater modelling. Submethodology M07 from the Bioregional Assessment Technical Programme. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/submethodology/M07.
Doherty J (2010) PEST: model-independent parameter estimation — user manual (fifth edition, with slight additions). Watermark Numerical Computing, Brisbane, Australia.
GHD (2012) Report for QWC 17-10 Surat Basin groundwater modelling: Stage 2 Surat cumulative management area groundwater model report. GHD Pty Ltd report to Queensland Water Commission.
Holland KL, Aryal SK, Bruce J, Carey H, Davies P, Ford J, Henderson B, Herr A, Janardhanan S, Merrin LE, Mitchell PJ, Mount RE, O’Grady AP, Ransley T, Sander R and Schmidt RK (2016) Conceptual modelling for the Maranoa-Balonne-Condamine subregion. Product 2.3 for the Maranoa-Balonne-Condamine subregion from the Northern Inland Catchments Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NIC/MBC/2.3.
OGIA (2014) Annual report 2014 for the Surat underground water impact report. Office of Groundwater Impact Assessment, Queensland Government. Viewed 24 March 2014, https://www.dnrm.qld.gov.au/__data/assets/pdf_file/0012/251310/surat-uwir-annual-report-2014.pdf.
QWC (2012) Underground water impact report for the Surat cumulative management area. Queensland Water Commission. Viewed 24 March 2014, https://www.dnrm.qld.gov.au/__data/assets/pdf_file/0016/31327/underground-water-impact-report.pdf.
SKM (2013) New Acland Coal Mine Stage 3 Project environmental impact assessment groundwater numerical modelling report version 3 – QE06644. August 2013. Prepared for New Hope Group by Sinclair Knight Merz (SKM) Global. http://www.aclandproject.com.au/files/files/stage-3-eis-2014/Appendix%20G4.5%20Groundwater%20Numerical%20Modelling%20Report.pdf
Product Finalisation date
- 2.6.2.1 Methods
- 2.6.2.2 Review of existing models
- 2.6.2.3 Model development
- 2.6.2.4 Boundary and initial conditions
- 2.6.2.5 Implementation of coal resource development pathway
- 2.6.2.6 Parameterisation
- 2.6.2.7 Observations and predictions
- 2.6.2.8 Uncertainty analysis
- 2.6.2.9 Limitations
- Glossary
- Citation
- Acknowledgements
- Contributors to the Technical Programme
- About this technical product