Page 49 of 51
This technical product was reviewed by several groups:
- Senior Science Leaders: David Post (Projects Director), Steven Lewis (Science Director, Geoscience Australia), Brent Henderson (Science Director, CSIRO), Becky Schmidt (Products Manager)
- Technical Assurance Reference Group: Chaired by Peter Baker (Principal Science Advisor, Department of the Environment and Energy), this group comprises officials from the NSW, Queensland, South Australian and Victorian governments
- Independent reviewers: Warwick McDonald (CSIRO), Dirk Mallants (CSIRO).
This document largely describes a model developed and run by Office of Groundwater Impact Assessment (OGIA). The additional CRDP coal mines have also been added using information provided by OGIA.
Last updated:
17 October 2018
Summary and download
Product Finalisation date
2016
PRODUCT CONTENTS
- 2.6.2.1 Methods
- 2.6.2.2 Review of existing models
- 2.6.2.3 Model development
- 2.6.2.4 Boundary and initial conditions
- 2.6.2.5 Implementation of coal resource development pathway
- 2.6.2.6 Parameterisation
- 2.6.2.7 Observations and predictions
- 2.6.2.8 Uncertainty analysis
- 2.6.2.9 Limitations
- Glossary
- Citation
- Acknowledgements
- Contributors to the Technical Programme
- About this technical product
ASSESSMENT
ASSESSMENT COMPONENT