AGL Energy Limited (2012) Water management plan for the Tiedman Irrigation Program – Gloucester. AGL Energy Limited, Sydney. Viewed 16 June 2015, http://www.agl.com.au/~/media/AGL/About%20AGL/Documents/How%20We%20Source%20Energy/Gloucester%20Document%20Repository/Irrigation%20Program/20120514_Tiedman%20Irrigation%20Program%20%20%20Water%20Management%20Plan.pdf.
AGL Energy Limited (2013) Annual report 2013, ASX release. Viewed 13 October 2015, https://www.agl.com.au/about-agl/media-centre/article-list/2013/sep/annual-report-2013.
AGL Energy Limited (2014a) Fact sheet: our plan for produced water. AGL, Sydney. Viewed 31 March 2015, http://www.agl.com.au/~/media/AGL/About%20AGL/Documents/How%20We%20Source%20Energy/Gloucester%20Document%20Repository/Fact%20Sheets/20140821_Fact%20Sheet%20GGP%20%20%20Our%20plan%20for%20produced%20water.pdf.
AGL Energy Limited (2014b) Gloucester Gas Project – extracted water management strategy (Consultation draft). AGL Energy Limited, Sydney. Viewed 16 June 2015, http://www.agl.com.au/~/media/AGL/About%20AGL/Documents/How%20We%20Source%20Energy/Gloucester%20Document%20Repository/Water%20Plans/20140821_Extracted%20Water%20Management%20Strategy%20%20%20Consultation%20Draft.pdf.
AGL Energy Limited (2014c) Produced water management plan for PEL285. AGL Energy Limited, Sydney. Viewed 16 June 2015, http://www.agl.com.au/~/media/AGL/About%20AGL/Documents/How%20We%20Source%20Energy/Gloucester%20Document%20Repository/Water%20Plans/20141022_Produced%20Water%20Management%20Plan%20for%20PEL%20285.pdf.
AGL Energy Limited (2014d) Surface water and groundwater management plan for the Waukivory Pilot Program – Gloucester Gas Project. Sydney. Viewed 16 June 2015, http://www.agl.com.au/~/media/AGL/About%20AGL/Documents/How%20We%20Source%20Energy/Gloucester%20Document%20Repository/Water%20Plans/20141022_Surface%20Water%20and%20Groundwater%20Management%20Plan%20for%20the%20Waukivory%20Pilot%20Program.pdf.
AGL Upstream Investments Pty Limited (2014) Fracture stimulation management plan Waukivory Pilot Project, Gloucester NSW. AGL Upstream Investments Pty Limited, Sydney. Viewed 16 June 2015, http://www.agl.com.au/~/media/AGL/About%20AGL/Documents/How%20We%20Source%20Energy/Gloucester%20Document%20Repository/Review%20of%20Environmental%20Factors/20140630_AGL%20Fracture%20Stimulation%20Management%20Plan%20Gloucester%20Waukivory%20V2%20June%202014.pdf.
Australasian Groundwater and Environmental Pty Ltd (2013) Rocky Hill Coal Project groundwater assessment, Part 4 of the Specialist Consultant Studies Compendium, Technical report by Australasian Groundwater and Environmental Pty Ltd for Gloucester Coal Limited. Australasian Groundwater and Environmental Pty Ltd, Sydney. Viewed 10 September 2013, http://www.rockyhillproject.com.au/wp-content/uploads/2013/08/80604-Vol-2_Part-4-Groundwater.pdf.
Duralie Coal Mine (2013) Water management plan. Duralie Coal Mine, Sydney. Viewed 16 June 2015, http://www.duraliecoal.com.au/documents/community_environment/WAMP-R02-D.pdf.
Gloucester Resources Limited (2013) Environmental impact statement for the Rocky Hill Coal Project. Development Application No. SSD-5156, August 2013.
Heritage Computing (2009) Duralie Extension Project groundwater assessment, a hydrogeological assessment of the Duralie Extension Project environmental assessment, Technical report by Heritage Computing Pty Limited for Duralie Coal Pty Ltd. Heritage Computing Pty Limited, Sydney. Viewed 10 September 2013, http://www.gloucestercoal.com.au/documents/Enviro_EAD_DCM_2010_Appendix_B_Groundwater%20Assessment.pdf.
Heritage Computing (2012) A hydrogeological assessment in support of the Stratford Coal Project environmental impact statement, Technical report by Heritage Computing Pty Limited for Stratford Coal Pty Ltd. Heritage Computing Pty Limited, Sydney. Viewed 10 September 2013, http://www.stratfordcoal.com.au/documents/environment/eis/Appendix%20A%20-%20Groundwater%20Assessment.pdf.
Hodgkinson JH, Pinetown KL, Wilkes PG, McVicar TR and Marvanek SP (2014) Coal and coal seam gas resource assessment for the Gloucester subregion. Product 1.2 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. Viewed 16 June 2015, http://data.bioregionalassessments.gov.au/product/NSB/GLO/1.2.
Lewis S (2014) Developing a coal resource development pathway. A submethodology from the Bioregional Assessment Technical Programme. Department of the Environment, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. Viewed 19 Month 2016, http://data.bioregionalassessments.gov.au/submethodology/M04.
NSW Government (2013) Strategic Agricultural Lands Dataset, NSW Department of Planning and Infrastructure. Viewed 12 May 2014, http://www.planning.nsw.gov.au/StrategicPlanning/SpatialData/tabid/645/language/en-US/Default.aspx.
NSW Government (2014) Strategic Regional Land Use Policy. New South Wales Government. Viewed 12 May 2014, http://www.nsw.gov.au/initiative/strategic-regional-land-use.
Peeters LJM, Dawes WR, Rachakonda PR, Pagendam DE, Singh RM, Pickett TW, Frery E, Marvanek SP and McVicar TR (2018) Groundwater numerical modelling for the Gloucester subregion. Product 2.6.2 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/GLO/2.6.2.
RW Corkery & Co Pty Ltd (2012a) Environmental impact statement, Rocky Hill Coal Project, Section 2, description of the proposal, Technical Report by RW Corkery & Co Pty Ltd for Gloucester Resources Limited. RW Corkery & Co Pty Limited, Sydney. Viewed 16 June 2015, https://majorprojects.affinitylive.com/public/57b22dfaca01c9184d709863ee383722/14.%20Rocky%20Hill%20Coal%20Project%20EIS%20-%20Section%202_Description%20of%20the%20Proposal%202.6%20to%202.16.pdf.
RW Corkery & Co Pty Ltd (2012b) Environmental impact statement, Rocky Hill Coal Project, Section 4, environmental features, management measures and impacts, Technical Report by RW Corkery & Co Pty Ltd for Gloucester Resources Limited. RW Corkery & Co Pty Ltd, Sydney. Viewed 16 June 2015, https://majorprojects.affinitylive.com/public/690a4a86107a605f403f66f5104f963e/16.%20Rocky%20Hill%20Coal%20Project%20EIS%20-%20Section%204_Env%20Features,%20Mgt%20Measures%20and%20Impacts%204.1%20to%204.11.pdf.
Stratford Coal Mine (2012) Water management plan. Stratford Coal Mine, Sydney. Viewed 16 June 2015, http://www.stratfordcoal.com.au/documents/environment/Stratford_Mining_Complex_Water_Management_Plan.pdf.
WRM Water & Environment Pty Ltd (2013) Rocky Hill Coal Project surface water assessment, Part 5 of the Specialist Consultant Studies Compendium, Technical report by WRM Water & Environment Pty Ltd for Gloucester Coal Limited. WRM Water & Environment Pty Ltd, Sydney. Viewed 16 June 2015, http://www.rockyhillproject.com.au/wp-content/uploads/2013/08/80604-Vol-2_Part-5-Surface-Water-Sections-1-to-2.pdf, http://www.rockyhillproject.com.au/wp-content/uploads/2013/08/80604-Vol-2_Part-5-Surface-Water-Sections-3-to-5.pdf, http://www.rockyhillproject.com.au/wp-content/uploads/2013/08/80604-Vol-2_Part-5-Surface-Water_Appendices-A-and-B.pdf, http://www.rockyhillproject.com.au/wp-content/uploads/2013/08/80604-Vol-2_Part-5-Surface-Water_Appendices-C-and-D.pdf.
Yancoal (2014) ASX Release 13 March 2014 – Coal resource and reserve statements for year ending December 2013. Yancoal Australia Limited. Viewed 13 October 2015, http://www.yancoal.com.au/icms_docs/184697_2013_Resources_and_Reserves.pdf.
Yancoal (2015a) Duralie coal annual review – 2015. Yancoal Australia Limited. Viewed 18 December 2015, http://www.duraliecoal.com.au/documents/community_environment/Duralie%20Annual%20Review%202015_Finalv3.pdf.
Yancoal (2015b) Stratford Mining Complex annual review – 2015. Yancoal Australia Limited. Viewed 18 December 2015, http://www.stratfordcoal.com.au/documents/environment/Stratford%20Annual%20Review%202015_Finalv3.pdf.
Zhang YQ, Viney NR, Peeters LJM, Wang B, Yang A, Li LT, McVicar TR, Marvanek SP, Rachakonda PK, Shi XG, Pagendam DE and Singh RM (2018) Surface water numerical modelling for the Gloucester subregion. Product 2.6.1 for the Gloucester subregion from the Northern Sydney Basin Bioregional Assessment. Department of the Environment and Energy, Bureau of Meteorology, CSIRO and Geoscience Australia, Australia. http://data.bioregionalassessments.gov.au/product/NSB/GLO/2.6.1.
Product Finalisation date
- 2.3.1 Methods
- 2.3.2 Summary of key system components, processes and interactions
- 2.3.3 Ecosystems
- 2.3.4 Baseline and coal resource development pathway
- 2.3.5 Conceptual modelling of causal pathways
- Citation
- Currency of scientific results
- Acknowledgements
- Contributors to the Technical Programme
- About this technical product